PROJECT PORTFOLIO

Commisioning

SKANSKA INTERIOR BUILD-OUT

ENVI Engineering was the Commissioning Agent for the first generation interior build-out LEED offices in Houston, Texas.  The project consisted of 5 levels, totaling 136,893 square feet, with the remaining levels of the building to be occupied by multiple tenants. The facility includes typical office areas, such as lobby and reception areas, conference room areas, meeting rooms, offices, open work areas, and break rooms.The Skanska Interior Build-Out project implemented the LEED for Commercial Interiors (CI) 2009 certification inclusive of...

GRAND OAKS HIGH SCHOOL

ENVI Engineering provided Commissioning services for Conroe ISD’s Grand Oaks High School. The facility includes typical educational areas, such as administration areas, classroom areas, media/library center, gymnasium, athletics, career and technology, music, arts, cafeteria, and kitchen.Conroe Independent School District chose the Commissioning Process as their quality-oriented process for achieving, verifying and documenting, the performance of Grand Oaks High School’s building systems and assemblies. Systems commissioned were plumbing, mechanical, lighting controls, generator, and building automation controls. Commissioning ProjectSpring, Texas Education: pk –...

KLEIN FOREST HIGH SCHOOL CTE & FIELD HOUSE ADDITION

ENVI Engineering provided Systems Commissioning services for the new construction additions for Klein Forest High School.   The two-story Career and Technical Education (CTE) addition includes educational areas such as cosmetology classrooms and lab, auto mechanics classrooms and shop, welding classrooms and lab, small engine classrooms and shop, interior design classrooms, FCS classrooms and lab, culinary arts classroom and kitchen, and agricultural classrooms.  The two-story Field House addition includes a dance studio and JROTC classrooms.Klein Independent School District chose the...

IRONS JUNIOR HIGH SCHOOL CLASSROOM ADDITION

ENVI Engineering provided Building Systems Commissioning for the 2-story, classroom addition to Irons Junior High School.  Systems commissioned included the mechanical airside systems, lighting control system and building automation control system following ASHRAE Guideline 0 – The Commissioning Process. Commissioning ProjectHouston, Texas Education: pk – 1214,165 square feet

HARRIS COUNTY 911 CALL CENTER

Harris County chose the LEED for New Construction (NC) 2009 certification inclusive of the Enhanced Commissioning process as their quality-oriented process for achieving, verifying and documenting, that the performance of their office space systems and assemblies meet their defined objectives and criteria.  Systems commissioned were mechanical, geothermal, lighting controls, emergency generators, plumbing, and building automation system.ENVI Engineering provided the LEED Credit for Energy and Atmosphere Prerequisite 1 – Fundamental Commissioning of Building Energy Systems and Energy and Atmosphere Credit...

LEMM ELEMENTARY SCHOOL

ENVI Engineering provided Building Systems Commissioning for the re-construction of LEMM Elementary School. The facility was impacted by the effects of Hurricane Harvey.  Flood damage resulted in 100% of the facility to be re-constructed.  The facility includes typical educational areas, such as administration areas, classroom areas, media/library center, gymnasium, cafeteria, and kitchen.Klein Independent School District chose the Commissioning Process as their quality-oriented process for achieving, verifying and documenting, the performance of LEMM Elementary School’s building systems and assemblies. Systems...

KIRBY COLLECTION

ENVI Engineering provided Building Systems Commissioning for the newly constructed Kirby Collection Project.  The Kirby Collection is a new, multi-use facility centrally located in the Houston area to provide the ultimate live-work-play community and elevate the standard of urban living.  The facility includes a 13-story, 210,200 square feet, Class A office building, a 25-story, 421,000 square feet high-end residential tower, two levels of retail space, and 6 floor parking garage. Fundamental and Enhanced commissioning services were performed for the mechanical,...

KIRKLAND & ELLIS

ENVI Engineering was the Commissioning Agent for the tenant buildout of Kirkland & Ellis Corporate Office space.Kirkland & Ellis chose the LEED for Commercial Interiors (CI) 2009 certification inclusive of the commissioning process as their quality-oriented process for achieving, verifying and documenting that the performance of their Corporate Office space systems and assemblies meet their defined objectives and criteria. Systems commissioned where mechanical, lighting and controls, and plumbing.The scope of work accomplished by ENVI included Fundamental and Enhanced commissioning...

KLEIN CAIN HIGH SCHOOL

ENVI Engineering was the Commissioning Agent for the new construction of Klein Cain High School. The facility includes typical educational areas, such as administration areas, classroom areas, media/library center, gymnasium, natatorium, auditorium, cafeteria, and kitchen.Klein Independent School District chose the Commissioning Process as their quality-oriented process for achieving, verifying and documenting, the performance of Klein Cain High School’s building systems and assemblies. Systems commissioned were plumbing, mechanical, electrical, building automation control systems, and emergency power.Commissioning ProjectKlein, Texas Education: pk – 12679,289...

HARRIS COUNTY DA & DC WAREHOUSE RENOVATION

ENVI Engineering was the Commissioning Agent for the renovation and buildout of a 175k square foot warehouse building for the Harris County District Attorney and District Clerk. The county purchased the 1942 building in 2012 with the intent to provide records storage, constable’s office and district attorney’s office.Harris County chose the LEED for New Construction (NC) 2009 certification inclusive of the Enhanced Commissioning process as their quality-oriented process for achieving, verifying and documenting, that the performance of their office...

LEGACY COMMUNITY HEALTH CENTER

ENVI Engineering was the Commissioning Agent for the new facility construction of a 16,500 square foot, two-story Legacy Community Health 5th Ward Clinic. The clinic is a full-service, Federally Qualified Health Center that identifies unmet needs and gaps in health-related services and develops client-centered programs to address community needs. The organization currently provides adult primary care, pediatrics, dental care, vision services, behavioral health services, OB/GYN and maternity, vaccinations and immunizations, health promotion and community outreach, wellness and nutrition, and...

GREATER HOUSTON PARTNERSHIP

ENVI Engineering was the Commissioning Agent for the tenant buildout of 53,000 square feet for Greater Houston Partnership offices within the Partnership Tower. The facility includes typical office areas, such as lobby and reception areas, conference room areas, meeting rooms, offices, open work areas, and break rooms. This space is unique in that it includes a 2,000 square foot terrace, 19-panel video/interactive display, and a large area for hosting-assembling.Greater Houston Partnership chose the LEED for Commercial Interiors (CI) 2009...

METRONATIONAL – CORPORATE OFFICE

ENVI Engineering was the Commissioning Agent for the tenant buildout of 22,145 square feet for MetroNational’s Corporate office.MetroNational chose the LEED for Commercial Interiors (CI) 2009 certification inclusive of the commissioning process as their quality-oriented process for achieving, verifying and documenting, that the performance of their Corporate Office space systems and assemblies meet their defined objectives and criteria. Systems commissioned were mechanical, electrical, plumbing, and special systems.The scope of work accomplished by ENVI included fundamental commissioning services for the...

KLEIN ISD GRACE ENGLAND EARLY CHILDHOOD/PRE-KINDERGARTEN CENTER**

Ms. Soto was the lead Commissioning Agent for a $8.1 million, 65,500 square feet Early Childhood/Pre-kindergarten Center Texas-CHPS project.  Systems commissioned included the central plant, mechanical systems, electrical systems, plumbing systems, and building automation control system.The scope of work accomplished by Ms. Soto included key activities following ASHRAE Guideline 0 – The Commissioning Process.**Experience with Previous EmployersCommissioning ProjectHouston, Texas Education: PK – 1265,500 square feet

KLEIN ISD MULTIPURPOSE CENTER**

Ms. Soto was the lead Commissioning Agent for a $16.9 million, 125,730 square feet Multipurpose Center Buildings A and B.  Ms. Soto provided administrative and technical support to the project team and developed commissioning documentation for the project.  Systems commissioned include central plant, mechanical systems, electrical systems, plumbing systems, and building automation control system.The scope of work accomplished by Ms. Soto included key activities following ASHRAE Guideline 0 – The Commissioning Process.**Experience with Previous EmployersCommissioning ProjectKlein, Texas Education: PK – 12125,730...

KLEIN ISD FRENCH ELEMENTARY SCHOOL

 ENVI Engineering was the Commissioning Agent for the new facility construction of 125,609 square feet for Klein French Elementary School. The facility will include typical educational areas, such as administration areas, classroom areas, media/library center, gymnasium, cafeteria, and kitchen. Klein Independent School District chose the Commissioning Process as their quality-oriented process for achieving, verifying and documenting, the performance of French Elementary’s building systems and assemblies. Systems commissioned were plumbing, mechanical, electrical, controls systems, and electrical power generation.The scope of work accomplished...

KLEIN HIGH SCHOOL

ENVI Engineering was the Commissioning Agent for the renovation and expansion of 630,000 square feet for Klein High School.  Klein Independent School District chose Building Commissioning as their quality-oriented process for achieving, verifying, and documenting that the performance of all Klein High School building systems and assemblies meet their defined objectives and criteria.  The construction process occurred in two phases.  Systems commissioned were the mechanical and controls systems. The scope of work accomplished by ENVI included key activities following ASHRAE...

Houston Area Safety Council – Clinic & Skills Buildings

ENVI Engineering was the Commissioning Agent for the new facility construction of 33,596 square feet for Houston Area Safety Council (HASC).The Clinic building will contain areas such as exam rooms, treatment rooms, administration, lobby, radiology, and physical therapy.  The Skills building will contain areas such as classrooms, offices, high bay area for vocational training, and welding training.HASC chose the Commissioning Process as their quality-oriented process for achieving, verifying and documenting, the performance of the Clinic & Skills building systems...

FORT BEND ISD JAMES BOWIE MIDDLE SCHOOL**

Ms. Soto was the lead Commissioning Agent for Fort Bend ISD’s $23.7 million, 232,500 square feet Middle School project.  Systems commissioned included the central plant, mechanical systems, electrical systems, plumbing systems, security systems, irrigation systems, and building automation control system. The scope of work accomplished by Ms. Soto included key activities following ASHRAE Guideline 0 – The Commissioning Process. **Experience with Previous Employers Commissioning ProjectRichmond, Texas Education: PK – 12232,500 square feet

Retro Commissioning / Energy Audit

SHELDON ELEMENTARY SCHOOL & SHELDON EARLY CHILDHOOD ACADEMY

 Mrs. Soto with ENVI Engineering was the Retro-Commissioning Agent representing CenterPoint Energy’s  Retro-Commissioning Program for Sheldon ISD Sheldon Elementary School & Sheldon Early Childhood Academy.  The project followed a three phase process (planning, investigation, and verification phase) that incorporates Owner involvement with the technical expertise of the Retro-Commissioning Agent at each phase.Retro-Commissioning ProjectHouston, TexasEducation: PK – 12207,500 square feet (combined)

SHELDON ISD ROYALWOOD ELEMENTARY SCHOOL & NULL MIDDLE SCHOOL

Mrs. Soto with ENVI Engineering was the Retro-Commissioning Agent representing CenterPoint Energy’s  Retro-Commissioning Program for Sheldon ISD Royalwood Elementary School & Null Middle School.  The project followed a three phase process (planning, investigation, and verification phase) that incorporates Owner involvement with the technical expertise of the Retro-Commissioning Agent at each phase.Retro-Commissioning ProjectHouston, Texas Education: PK – 12294,041 square feet (combined)

SHELDON ISD CARROLL ELEMENTARY SCHOOL & NULL MIDDLE SCHOOL

Retro-Commissioning ProjectHouston, Texas Education: PK – 12294,041 square feet (combined)Mrs. Soto with ENVI Engineering was the Retro-Commissioning Agent representing CenterPoint Energy’s  Retro-Commissioning Program for Sheldon ISD Carroll Elementary School & Null Middle School.  The project followed a three phase process (planning, investigation, and verification phase) that incorporates Owner involvement with the technical expertise of the Retro-Commissioning Agent at each phase. PROJECT TYPESCommissioningRetro Commissioning / Energy Audit

FORT BEND ISD JORDAN ELEMENTARY SCHOOL & MR WOOD

Mrs. Soto with ENVI Engineering was the Retro-Commissioning Agent representing CenterPoint Energy’s  Retro-Commissioning Program for Fort Bend ISD Jordan Elementary School & MR Wood Alternative School.  The project followed a three phase process (planning, investigation, and verification phase) that incorporates Owner involvement with the technical expertise of the Retro-Commissioning Agent at each phase. Retro-Commissioning ProjectRichmond, Texas Sugar Land, TexasEducation: PK – 12130,870 square feet (combined)

FORT BEND ISD EA JONES ELEMENTARY SCHOOL & MISSOURI CITY MIDDLE SCHOOL

Mrs. Soto with ENVI Engineering was the Retro-Commissioning Agent representing CenterPoint Energy’s  Retro-Commissioning Program for Fort Bend ISD EA Jones Elementary School & Missouri City Middle School.  The project followed a three phase process (planning, investigation, and verification phase) that incorporates Owner involvement with the technical expertise of the Retro-Commissioning Agent at each phase. Retro-Commissioning ProjectMissouri City, TexasEducation: PK – 12307,627 square feet (combined)

FORT BEND ISD CLEMENTS HIGH SCHOOL**

Mrs. Soto was the Retro-Commissioning Agent representing CenterPoint Energy’s  Retro-Commissioning Program for Clements High School.  The project followed a three phase process (planning, investigation, and verification phase) that incorporates Owner involvement with the technical expertise of the Retro-Commissioning Agent at each phase.**Experience with Previous EmployersRetro-Commissioning ProjectSugar Land, TexasEducation: PK – 12373,305 square feet

Energy Star

PARK LAUREATE – ENERGY STAR® CERTIFICATION

ENVI Engineering provided ENERGY STAR® Licensed Professional Services for Park Laureate.The scope of work accomplished by ENVI included the following key activities for the Environmental Protection Agency’s (EPA) ENERGY STAR® certification.Utilize ENERGY STAR® Portfolio Manager to enter the required whole building operational and energy data for all active meters that account for all energy use in the building.Generate ENERGY STAR® Statement of Energy Performance document.Generate ENERGY STAR® Data checklist document.A licensed Professional Engineer conducted a site visit to assess...

FORT BEND INDEPENDENT SCHOOL DISTRICT – ENERGY STAR® CERTIFICATION**

ENVI Engineering provided ENERGY STAR® Licensed Professional Services for Fort Bend Independent School District for six (6) facilities that applied for Environmental Protections Agency’s (EPA) ENERGY STAR certification.The scope of work provided by ENVI included the following key activities for the Environmental Protection Agency’s (EPA) ENERGY STAR® certification.Utilize ENERGY STAR® Portfolio Manager for whole building operational and energy data.Generate ENERGY STAR® Statement of Energy Performance document.Generate ENERGY STAR® Data checklist document.Site visit by a Professional Engineer to assess the...

Energy Conservation

KLEIN ISD ENERGY CONSERVATION PROJECT**

 A $2.5 million dollar Energy Conservation project inclusive of control upgrades, re-commissioning, outside air modifications, including CO2 demand ventilation, and HVAC equipment replacement.  Project consisted of analyzing all 36 facilities in the Klein district for energy saving opportunities.  Building utility and operations data was gathered and analyzed for all facilities.  Energy saving opportunities were identified and quantified.  Detailed construction drawings for bidding were developed.**Experience with Previous EmployersSpring, Texas Education: PK – 12

LEED Certified

HARRIS COUNTY DA & DC WAREHOUSE RENOVATION

ENVI Engineering was the Commissioning Agent for the renovation and buildout of a 175k square foot warehouse building for the Harris County District Attorney and District Clerk. The county purchased the 1942 building in 2012 with the intent to provide records storage, constable’s office and district attorney’s office.Harris County chose the LEED for New Construction (NC) 2009 certification inclusive of the Enhanced Commissioning process as their quality-oriented process for achieving, verifying and documenting, that the performance of their office...

LEGACY COMMUNITY HEALTH CENTER

Commissioning ProjectHouston, TexasNew Construction, Commercial, Healthcare, LEED16,500 square feet ENVI Engineering was the Commissioning Agent for the new facility construction of a 16,500 square foot, two-story Legacy Community Health 5th Ward Clinic. The clinic is a full-service, Federally Qualified Health Center that identifies unmet needs and gaps in health-related services and develops client-centered programs to address community needs. The organization currently provides adult primary care, pediatrics, dental care, vision services, behavioral health services, OB/GYN and maternity, vaccinations and immunizations, health...

HARRIS COUNTY 911 CALL CENTER

Harris County chose the LEED for New Construction (NC) 2009 certification inclusive of the Enhanced Commissioning process as their quality-oriented process for achieving, verifying and documenting, that the performance of their office space systems and assemblies meet their defined objectives and criteria.  Systems commissioned were mechanical, geothermal, lighting controls, emergency generators, plumbing, and building automation system.ENVI Engineering provided the LEED Credit for Energy and Atmosphere Prerequisite 1 – Fundamental Commissioning of Building Energy Systems and Energy and Atmosphere Credit...

KIRBY COLLECTION

ENVI Engineering provided Building Systems Commissioning for the newly constructed Kirby Collection Project.  The Kirby Collection is a new, multi-use facility centrally located in the Houston area to provide the ultimate live-work-play community and elevate the standard of urban living.  The facility includes a 13-story, 210,200 square feet, Class A office building, a 25-story, 421,000 square feet high-end residential tower, two levels of retail space, and 6 floor parking garage. Fundamental and Enhanced commissioning services were performed for the mechanical,...

KIRKLAND & ELLIS

ENVI Engineering was the Commissioning Agent for the tenant buildout of Kirkland & Ellis Corporate Office space.Kirkland & Ellis chose the LEED for Commercial Interiors (CI) 2009 certification inclusive of the commissioning process as their quality-oriented process for achieving, verifying and documenting that the performance of their Corporate Office space systems and assemblies meet their defined objectives and criteria. Systems commissioned where mechanical, lighting and controls, and plumbing.The scope of work accomplished by ENVI included Fundamental and Enhanced commissioning...

GREATER HOUSTON PARTNERSHIP

ENVI Engineering was the Commissioning Agent for the tenant buildout of 53,000 square feet for Greater Houston Partnership offices within the Partnership Tower. The facility includes typical office areas, such as lobby and reception areas, conference room areas, meeting rooms, offices, open work areas, and break rooms. This space is unique in that it includes a 2,000 square foot terrace, 19-panel video/interactive display, and a large area for hosting-assembling.Greater Houston Partnership chose the LEED for Commercial Interiors (CI) 2009...

METRONATIONAL – CORPORATE OFFICE

ENVI Engineering was the Commissioning Agent for the tenant buildout of 22,145 square feet for MetroNational’s Corporate office.MetroNational chose the LEED for Commercial Interiors (CI) 2009 certification inclusive of the commissioning process as their quality-oriented process for achieving, verifying and documenting, that the performance of their Corporate Office space systems and assemblies meet their defined objectives and criteria. Systems commissioned were mechanical, electrical, plumbing, and special systems.The scope of work accomplished by ENVI included fundamental commissioning services for the...

Houston Area Safety Council – Clinic & Skills Buildings

ENVI Engineering was the Commissioning Agent for the new facility construction of 33,596 square feet for Houston Area Safety Council (HASC).The Clinic building will contain areas such as exam rooms, treatment rooms, administration, lobby, radiology, and physical therapy.  The Skills building will contain areas such as classrooms, offices, high bay area for vocational training, and welding training.HASC chose the Commissioning Process as their quality-oriented process for achieving, verifying and documenting, the performance of the Clinic & Skills building systems...